Impact Assessment

List of EIA/EMP’s ongoing / completed

Cement


Sr.No.
Project Proponent Project details & Plant Cap. EIA presentation
1Grasim Cement RaipurCement Plant 1 MTPA Cap.Grinding unitREIA / CEIA MoEF / State
2Lafarge India Ltd., RaipurCement Plant Expansion 1 to 1.5 MTPA Cap REIA MoEF

Integrated Steel & Power Plants

Sr.No. Project Proponent Project details & Plant Cap. EIA presentation
1jayaswals NECO Ltd., Siltara, Raipur, C.G.Steel Plant 1200 TPD pig Iron, 14 MW CogenREIA / CEIA MoEF
2Navbharat Fuse Co. Ltd.,Jagdalpur, C.G.Sponge IronREIA State
3Abhijeet Infrastructure Pvt. Ltd., C/o Jayaswals NECO Ltd., Siltara, Raipur, C.G120000 MT DRI & 8MW Power Plant
4API-Ispat & Powertech Pvt. Ltd., Siltara, Raipur, C.G350 TPD Sponge Iron, 12 MT Induction & 16 MW Power PlantREIA State
5Jayaswals NECO Ltd., Steel Plant Division, Siltara Raipur, C.G.Coke Oven Plant (2,68,110 TPA Capacity) & 21 MW Power PlantREIA MoEF /State
6Corporate Ispat Alloys Ltd., C/o Jayaswals NECO Ltd., Siltara Raipur, C.GCoal Based DRI (1,50,000 TPA), CPP (15 MW) & Ferro Alloys Prodn.REIA State
7Shree Radhe Industries Ltd., Sirgitti Industrial Area, Bilaspur, C.G.100X2 TPD Sponge Iron & 8MW Waste Recovery PowerREIA State
8Hare Krishna Sponge Iron, Raipur, C. GExpansion 60,000 TPAREIA State
9Singhal Industries Raigarh , C.G.ExpansionREIA State
10Euro Pratik Ispat Ltd., Siltara Raipur, C.G.Sponge Iron REIA State
11Tata Steel ltd., Jamshedpur, C.GProposed integrated steel plant, JagdalpurREIA State
12Rashmi Sponge Iron Ltd. Raipur, C.G.ExpansionREIA State
13Jayaswals NECO Ltd., Steel Plant Division, Siltara Raipur, C.G.DRI plant, 500 x 6 & Power Plant 72 MW WHRB power plant.REIA State / MoEF
14MECON Ltd., Ispat Bhavan, Bhilai, C.GEIA data generationREIA State
15Chhattisgarh Electricity Company Ltd., Siltara Raipur, C. G.REIA proposed palletizing plant at village MandharREIA State
16Drolia Electrosteels (P) Ltd., Raipur (C.G.)REIA for sponge Iron Plant 200 TPDREIA State
17Real Ispat Ltd., RaipurREIA for Sponge Iron and Power PlantREIA State
18Sarda Energy & Minerals Ltd., Siltara, Mandhar, Raipur, CGIntegrated Steel Plant & 60 MW PPMoEF
19Bhuvee Profiles & Stainless Pvt. Ltd., Dhenkenal, Orissa Plate/ HR coil mill & forging shop project, Dist Dhenknal, Orissa.REIA - MoEF
20Rabirun Vinimay Pvt. Ltd., Dhenkenal, OrissaSS Strip / profile manufacturing Plant, Dist Dhenknal, Orissa.REIA - MoEF

Power Plants

Sr.No. Project ProponentProject details & Plant Cap.EIA presentation
1Manikgarh Power PlantP. O. Gadchandur -442908Dist :-Chandrapur (M.S.) 15 MW Thermal PowerREIA State / MoEFInterstate boundaryless than 50 Km
2Maa Usha Uraja Ltd., C/o Jayaswals NECO Ltd., RaipurBiomass Based Power Plant (7.5 MW)REIA State
3Aryan Coal Benefication Pvt. Ltd., Chakabura Korba C.G.Coal Based Thermal PowerPlant (30 M)REIA State
4STCLI Power Plant, Korba, C.G.Coal Wahsery Rejects Based Power Plant (2 x 25 MW = 50MW)REIA StateEC MoEf
5TATA Power Company Ltd., Mumbai MaharashtraData generation for proposed Power Plant near Jagdalpur (C.G.)Data generation1000 MW TPP
6Shri Shyam Warehousing & Power (P) Ltd., Janjgir, Champa (C.G.)Village Banari 10 MW rice husk based Power PlantREIA State
7Rukmani Power and Steel Ltd., Bilaspur (C.G.)Kharsia Dist. Raigarh 10 MW biomass based Power PlantREIA State
8Aryan Coal Benefications Pvt. Ltd., New DelhiRejected coal based 1 X 30 MW Power Plant at ChakaburaCEIA State
9Aryan Coal Benefications Pvt. Ltd., New DelhiProposed 30 MW Power Plant at Kaisapali (C.G.)REIA - State
10Patni Power Projects, Raigarh CGProposed 540 MW TPPREIA MoEF
11Patni Energy Pvt. Ltd., at Alibag, Raigad, MaharashtraProposed 405 MW TPPREIA MoEF
12Sai Chemicals Pvt. Ltd., Rajnandgaon (C.G.)Rajnandgaon District 8 MW captive Power PlanREIA - State
13Sarda Energy & Minerals Ltd., Raigarh, CGProposed 350 MW TPPREIA MoEF
14Vandana Energy & steels (P) Ltd., Raipur,Proposed 70 MW power plant at KorbaREIA - State / MoEF
15Vandana Vidhyut Ltd., RaipurProposed 540 MW power plant at KorbaREIA MoEF
16e- Gateway India Pvt. Ltd., New DelhiProposed 4 X 300 MW near Pamgarh, BilaspurREIA MoEF
17IND-BARATH Energies Ltd., Hyderabad for ISPAT GroupProposed 4 X 300 MW at Baloda Village (C.G.)REIA MoEF
18Korba West Power Co. Ltd., New DelhiProposed 2 X 300 MW Power Plant near Raigarh (C.G.)REIA MoEF
19Shri Shyam Warehousing & Power (P) Ltd., Janjgir, Champa (C.G.)Village Banari 10 MW rice husk based Power PlantREIA State
20Jhabua Power Ltd., New DelhiProposed 2 X 300 MW Power Plant near Seoni (M.P.)REIA MoEF
21Spectrum Coal & Power Ltd., Ratija, Korba (C.G.)Proposed 1 X 50 MW Power Plant at Ratija (C.G.)REIA State
22Aryan Coal Benefications Pvt. Ltd., New DelhiProposed 1 X 60 MW Power Plant at Wani (M.S.)REIA State
23Aryan Coal Benefications Pvt. Ltd., New DelhiProposed 1 X 60 MW Power Plant at Pandarpauni (M.S.)REIA State

Asbestos


Sr.No.
Project ProponentProject details & Plant Cap.EIA presentation
1Eternit Everest Ltd., Nashik, MaharashtraAsbestos sheetsPlant Expansion CEIA / MoEF
2Hyderabad Industries Ltd., Wada, District : Thane MaharashtraAsbestos sheets 75,000 TPA + 250 TPM Acceso Plant ExpansionREIA State / MoEF
3Lafarge India Ltd.,Raipur, C.GSonadih Lime Stone Mine ExpansionREIA MoEF
4Madhypradesh State Mining Corporation Ltd., Bhopal, M.P.2.52 Hectors Mugdhara Dolomite mineREIA MoEF
5Bharat Aluminium Co. Ltd., Balco Nagar, Korba C.G.Kawardha Bauxite Mine 670 HectorsREIA - MoEF
6Madhypradesh State Mining Corporation Ltd., Bhopal M.PRock Phosphate Mine at JhabuaREIA State
7Dolomite Mining Corporation Janjgir Champa (C.G.)Khamaria Dolomite Mines,REIA State
8SUNFLAG Iron & Steel Ltd., Nagpur (M.S.)Novamundi Iron Ore Mines, ZharkhandREIA State
9Sri Balaji Metals & Minerals Pvt. Ltd., Korba, C.G.EIA Dumarpara Dolomite MineREIA State
10Lemos Cement, Ranchi,JharkhandTwo limestone mines area 394 and 17 hectareREIA - MoEF
11Gyan Chand Agrawal, Lohardagga, ZharkhandThree Bauxite MinesREIA - MoEF
12Adani Enterprises Limited, Gurgaon, Delhi Open cast coal mine at Hasdeo Arand, (C.G.)REIA - MoEF
13Dighori Kynite Mine, Bhandara, Maharashtra EIA for 14.33 Ha. Kyanite mineREIA - State/ MoEF
14Sri. Durga Cement Co. Ltd., HazaribagEIA for Limestone minesREIA - State/ MoEF

Coal Washeries

Sr.No. Project Proponent Project details & Plant Cap. EIA presentation
1ST-CLI Coal Washeries Ltd., Ratiza, Korba C.G. Expansion project 3.0 - 5 MTPA Capacity REIA State
2ST-CLI Coal Washeries Ltd., Ratiza, Korba C.G. Expansion project 8 - 11 MTPA Capacity REIA MoEF
3ENESTEE Engineering Pvt. Ltd., Korba, C. G. Coal washery 1.5 MTPA Washed coal REIA State
4Hind Energy & Coal Beneficiation (India) Pvt. Ltd., Bilaspur (C.G.) Expansion project 1.2 MTPA to 2.4 MTPA REIA MoEF
5Phil Minerals Benefication & Energy Coal washery 1.2 MTPA at Beltara, Bilaspur REIA MoEF
6Hind Energy & Coal Beneficiation (India) Pvt. Ltd., Bilaspur (C.G.) Proposed project 2.4 MTPA at Village Dhatura, Dist :- Korba REIA MoEF
7Aryan Coal Benefications Pvt. Ltd., New Delhi(Kartikay Coal Washery Ltd.,) Expansion Coal Washery from 1.08 MTPA to 2.5 MTPA, REIA MoEF
8Hind Energy & Coal Beneficiation (India) Pvt. Ltd., Bilaspur (C.G.) cell is row 7, column 2 REIA MoEF
9Sarda Energy & Minerals Ltd., Raigarh, CG Proposed 0.96 MTPA coal washery REIA - State

Pharmaceuticals

Sr.No. Project Proponent Project details & Plant Cap. EIA presentation
1Lupin Ltd., Madideep, Bhopal, M.P.Bulk Drugs and formulation expansion REIA State / MoEF
2Ranbaxy Laboratories Ltd., Dewas, M.P.Presentation to PCB & NOC from Board REIA State
3Lupin Ltd., Mandideep, Bhopal (M.P.)REIA for expansion of project REIA - MoEF
4Lupin Pharmacare Ltd., Pithampur, (M.P.) Proposed REIA new bulk drugs and formulationREIA - MoEF

Hazardous Waste Development Site REIA

Sr.No. Project Proponent Project details & Plant Cap. EIA presentation
1Kinetic Motors Co. Ltd., Pithampur Indore, M.P. 100 Ton in two stage REIA of the Hz. Waste disposal site, State
2Force Motors Ltd., (Bajaj Tempo Ltd.,) Pithampur, M.P. 100 x 2 TON disposal site REIA of the Hz. Waste disposal site, State
3Pratibha Syntex Ltd., Pithampur M.P. 900 T disposal site REIA of the Hz. Waste disposal site, State
4Bharat Aluminium Co. Ltd., Korba C.G. 1600 TPD REIA of the Hz. Waste disposal site, State

Hazardous Waste Development Site REIA

Sr.No. Project Proponent Project details & Plant Cap. EIA presentation
1Road REIA for 41 Km road from Nagpur to Kondhali Road REIA for 41 Km road from Nagpur to Kondhali REIA - MoEF
2Force Motors Ltd., (Bajaj Tempo Ltd.,) Pithampur, M.P. Road REIA for 50 Km road from Talegaon to Amravati REIA - MoEF

Mining of Minerals

Sr. No.Project ProponentProject Details & Plant Cap.Date of EC Granted
1M/s. Nandi Agate MineNandi Village, Ambad Tehsil, Jalna District, Maharashtra.Cat B - 13.03.2018
2Smt. Rachana A. BelorkarEIA/EMP for Kawatha Manganese Mine (Lease area: 26.67 Ha) located at Kawatha Village, Saoner Tehsil, Nagpur District, Maharashtra.Cat A - 04.02.2020
3M/s Jindal Steel & Power Ltd.Amendment in Environment Clearance (EC) for undertaking Mining within already diverted 0.218 Ha. of Safety Zone at TRB Iron Ore mine, Tehsil Bonai, District Sundergarh, Odisha – 770038Cat A - 25.01.2022
4M/s. Ambuja Cements Limited (Maratha Cement Works)EIA-EMP for Sonapur-Thutra Limestone mine, Mine Lease III (Lease area:
49.00 Ha & Production Capacity 0.5 MTPA) located at Village Sonapur – Thutra, Tehsil Rajura and Korpana, District Chandrapur, Maharashtra .
Cat B - 06.08.2022
5M/s. Adani Power Maharashtra Limited (APML)Gondkhari Underground Coal Mine (Kamptee Coalfield) Of Production Capacity
2.0 MTPA (Rated Capacity)/3.0 MTPA (Peak Capacity) The Mine Lease Area Of
862.00 Ha Located At Village - Gondkhari, Tahsil Kalmeshwar, District – Nagpur (MH)
Cat A - 02.02.2024
6M/s Hindustan Copper Ltd.Surda Copper Mine for production of 0.9 million TPA (ROM) located at village (s) - Surda, Sohada, Pathargora, Benashole villages and Forest Block No. 1098, Tehsil - Ghatsila, District - East Singhbhum, Jharkhand (MLA: 323.16 ha.)Environmental Assignment.
Report Submitted to Client

Coal Washeries

Sr.
No.
Project ProponentProject Details & Plant Cap.Date of EC Granted
1M/s C.G Coal Power LimitedEIA-EMP for Proposed 2x2 MTPA Coal Washery (Wet Process) in an area of 8.195 Ha. at Village - Batari, Tehsil - Khatgora, District – Korba, State- Chhattisgarh.Cat A -
23.10.2020
2M/s SKS Ispat & Power Ltd.0.72 MTPA (Throughput) Wet Type Coal Washery at Village Siltara, Tehsil & District Raipur, ChhattisgarhCat B - Ongoing
3M/s. Tata Steel Ltd. (West Bokaro Division)West Bokaro Coking Coal Washery
of capacity 10.00 MTPA in west bokaro division of Tata Steel Ltd. (project area - 61.54 ha) at Village – duni, sarubera, atna, bhadwa & sondiha, Tehsil – mandu, district - ramgarh, jharkhand – 825314
Cat A - Ongoing

Metallurgical industries

Sr.
No.
Project ProponentProject Details & Plant Cap.Date of EC Granted
1M/s. Lingraj Steel and Power Private LimitedProposed Optimization Of Existing Rerolling Mill (Resultant Increase In Production From 60000 To 150000 TPA Capacity) Village - Gondwara, Urla Industrial Area, Tehsil And District Raipur (CG)Cat B - 22.01.2018
2M/s. Chandrahasni Ispat Pvt. Ltd.Proposed Installation Of Induction Furnace (132000 TPA M.S. Billets) With CCM And Rolling Mill (118000 TPA Rerolled Steel) With Online Hot Metal Charging Facility Village - Gerwani, Tehsil & District Raigarh (CG).Cat B -12.04.2018
3M/s. Suraj Product LimitedExpansion Of Existing (24000 TPA Pig Iron, 45000 TPA Sponge Iron And 100000 TPA Briquetting Plant) Village - Barpali, Post - Kesramal, Tehsil- Rajgangpur, District- Sundargarh (Odisha).Cat A -19.11.2018
4M/s. Primes Ispat LimitedProposed Expansion Of Induction Furnace From 33600 TPA To 141600 TPA MS Billets And Steel Rolling Mill Facilities From Coal /FO Fired 108000 TPA To 90000 And 44600 TPA Hot On Line Charging Total: 134600 TPA Re-Rolled Steel Village – Bana, Via Hirapur, Tehsil And District Raipur (CG).Cat B -14.02.2019
5M/s. Laxmikripa Steels & Power Pvt LtdProposed Production Of Mild Steel Billet 200000 TPA And Rerolled Steel Product 190000 TPA Village – Sondra, Tehsil And District Raipur (CG).Cat A -23.02.2019
6M/s. Krishna Iron Strips
and Tubes Pvt. Ltd.
Expansion Of Induction Furnace With CCM And Hot Charging At Rerolling Mill, Along with Existing Reheating Furnace To Produce Rerolled Steel Product, MS Black Pipe And Tube, Galvanizing And Fabrication Unit village: Sarora Tehsil-Raipur, Dist.- Raipur (Chhattisgarh)Cat B1 - 23.02.2019
7M/s. N.R. Steel and Ferro Pvt. Ltd.Proposed Implementation Of Production Facilities For MS Ingot/Billet And CCM (164160 TPA); Steel Rerolled Products From Hot Charging Rolling Mills 160800 TPA; MS Wire Drawing Unit 157500 TPA; Ferro Alloys 82000 TPA And/Or Pig Iron 164000 TPA (Greenfield Project) At Plot No.251,252,253 & 254, OP Jindal Ind. Park, Punjipathra, Vill. Tumidih, Tahsil - Gharghoda, District - Raigarh, (CG) .Cat A - 06.08.2021
8M/s. Mashiva Metals LLPGreenfield Project For Setting Up Submerged Arc Furnace Of 9 MVA X 2 Nos To Produce Silico Manganese 36,000TPA &/Or Ferro Manganese 46,000 TPA And/ Or Ferro Silicon 20,000 TPA And/ Or Pig Iron 63,000TPA By M/s. Mashiva Metals LLP Located At Plot No.255,257(P), OP Jindal Ind. Park, Vill. Tumidh, Tah Gharghoda, District Raigarh, CG.Cat A - 03.06.2021
9M/s. Sunil Sponge Pvt. Ltd.Proposed expansion of Induction Furnace capacity from 36,000TPA to 72,000 TPA at plot no 96,97 Siltara phase II industrial Area Village Siltara Tehsil and District Raipur ( C.G) – Violation CaseCat A - 13.12.2022
10M/s. Gravity Sponge and Power Pvt. Ltd.Propose implementation of facilities for production of sponge Iron MS Billet Steel Rerolled Products Such as wires roads etc., and Rerolled Structural Steel products, Ferro- Alloy or Pig Iron ,fly Ash Bricks along With Captive power Plant ( WHRB & AFBC) as a Greenfield project at village Champa Tehsil Tilda District Raipur Chhattisgarh.Cat A -17.02.2022
11M/s. S.S. Steel and PowerCapacity Expansion Through Implementation Of Additional Induction Furnace, CCM, Hot Charging Rerolling Mill, Wire Drawing Unit And MS Pipe Mill At Vill.– Pali, Khasra No. – 22/12, 22/13, And 22/15, Post – Gerwani, District – Raigarh CG – 496001.Cat B1- 28.06.2021
12M/s. Hindustan Coils LimitedProposed Expansion Of Induction Furnace From Capacity 60,000 TPA To 1,58,400 TPA (MS Billet) And Rerolled Steel Products Capacity From 56,745 TPA To 1,50,480 TPA (Thru Hot Charging) At Plot No. 19 - 20 Phase – 1, Siltara Industrial Growth Centre, Tehsil And District Raipur (CG)Cat B - 28.06.2021
13M/s. Ispat IndiaProposed Expansion Of Induction Furnace From Capacity 59000 TPA To 146520 TPA (M.S Billet Facilities) And Rerolled Steel Products Capacity From 55000 TPA To 139194 TPA At Siltara Industrial Growth Centre, Tah.&District Raipur (CG)Cat B - 28.06.2021
14M/s. NRVS Steels LimitedProposed To Expand The Existing Capacity Of Manufacturing Facilities For Production Of Sponge Iron, MS Billet, Along With Captive Power Generation Plant Comprising Of Waste Heat Recovery Boilers (WHRB) And Atmospheric Fluidized Bed Combustion (AFBC) Boiler.Cat A - 23.03.2022
15M/s. Maa
Kudargarhi Power and Ispat Private Limited
Proposed Installation Of Induction Furnaces With CCM To Produce 363000 TPA MS Ingot/Billets And/Or 350000 TPA Rolled Steel Product Through Hot Charging Rolling Mill At Village: Sarora, Block: Dharsiwa, Tehsil And District: Raipur, C.G.-493221.Cat B - 18.05.2022
16M/s. Kusum Smelters Pvt. Ltd.Implementation Of Product Facilities For Sponge Iron (245000 TPA); Mild Steel Billet (179550 TPA); Rerolled Steel Products Through Hot Charging (131970 TPA); Rerolled Steel Product Through Reheating Furnace (42194 TPA); Ferro Alloys (75000 TPA) And/Or Pig Iron (150000 TPA),
Captive Power 56 MW (16 MW Through WHRB And 40 MW Through AFBC) And Fly Ash Brick (150000 TPA) As A Greenfield Project, At Village - Dhamni, Tahsil - Patharia, District - Mungeli, Pincode- 495224 (CG).
Cat A - 26.06.2022
17M/s. Gauri Ganesh Ispat Private LimitedProposed Greenfield Project For Implementation Of New Manufacturing Facilities For Production Of Sponge Iron, MS Billets,Steel Rerolled Products, Ferro Alloys And/ Or Pig Iron; MS Black Pipe Mill; Galvanizing Unit And Fly Ash Brick Products Along With Captive Power Generation Plant Comprising Of Waste Heat RecoveryBoilers (WHRB) And Atmospheric Fluidized Bed Combustion (AFBC) Boiler Along With Steam Turbine & Generator.Cat A - 10.02.2023
18M/s. G. R.
Integrated Steel Pvt. Ltd.
Greenfield Project For A DRI Based Steel Plant To Produce Beneficiated Iron Ore Throughput 1,200,000 TPA; Iron Ore Pellets 1,800,000TPA;
Sponge Iron 198,000 TPA; Mild Steel Billets 194,040 TPA; Rerolled Steel Products Through Hot Charging & Through Reheating Furnace 224,070 TPA; Ferro Alloys 20,000 TPA And/ Or Pig Iron 40,000 TPA From 2.5 MVA X 4Nos. SAF; Captive Power Of 32MW (16MW Through WHRB And 16MW Through CFBC); Cement (PPC, PSC Or OPC) 100,000TPA And Fly Ash Bricks 138,600TPA.
Cat A - 26.09.2022
19M/s. HI-TECH
Power and Steel Limited
Proposed To Expand Manufacturing Facilities For Production Of Sponge Iron, MS Billet, Steel Rerolled Products (Through Hot Charging And Reheating Furnace) And, Captive Power Generation Plant Comprising Of Waste Heat Recovery Boilers (WHRB) And Atmospheric Fluidized Bed Combustion (AFBC) Boiler And Steam Turbine & Generator And Fly Ash Bricks Manufacturing Unit At Village: Parsada, Post: Sarora, Tehsil: Tilda, District: Raipur, Chhattisgarh.Cat A - 19.07.2023
20M/s. Niros Ispat Pvt. Ltd.Capacity Expansion Of Sponge Iron (97,500 TPA To 140,000 TPA); MS Billet (90,000 TPA To
192,500 TPA); Rerolled Steel Products (90,000 TPA To 180,000 TPA - Through Hot Charging 126000 TPA And Through Reheating Furnace 54,000 TPA); Existing Captive Power 8 Mw (Through WHRB); And Pipe Mill 175,000 TPA (New) Within Existing Plant Premises Plot No: 14-A, Heavy Industrial Area, Hathkhoj, Bhilai, Durg - 490024 State CG.
Cat A - 16.10.2023
21M/s. Kalindi Ispat Pvt. Ltd.Proposed Expansion of Existing Manufacturing Facilities For Production Of Sponge Iron, And Setting Up Down-Stream Integration By Way Of Producing MS Billet, Steel Rerolled Products, MS Black Pipe, Galvanizing Facility In The Unit Along With Captive Power Generation Plant Comprising Of Waste Heat Recovery Boilers (WHRB) And Atmospheric Fluidized Bed Combustion (AFBC) Boiler And Steam Turbine & Generator And Expansion Of Fly Ash Bricks Unit At Village Belpan, Tehsil Masturi, District Bilaspur, Chhattisgarh.Cat A - 20.11.2023
22M/s. Tata Steel Limited CRC WestProposed Expansion Of Existing Production Facilities For Cold Rolled Coils & Sheets (From 210000 TPA To 300000 TPA), Hot Rolled Pickled Skin Pass Coils (From 90000 TPA To 150000 TPA) And Addition Of New Facility For Hot Rolled Pickled Galvanized Coils (820000 TPA) At Plot No. S-76, MIDC, Tarapur Industrial Area, Post – Boisar, Tehsil
– Palghar, District – Palghar, Maharashtra – 401 506
Cat B - 15.12.2023
23M/s. Tata Steel Limited KhopoliRegularization Of Production Facilities For CR Coils
& Sheets (180000 TPA); Galvanized/Galume Coils
& Sheets (360000TPA); Colour Coated (Repainted) Coils & Sheets (120000TPA); Pipes & Tubes (120000 TPA); API Pipes, Pipe, Pipe For Low Pressure Service, Round Pipe & Tube For Mechanical And Structural Pipe And Square Structural Pipe (285000 TPA); Captive Power Plant (24 MW) Located At - Savroli, Po - Sajgaon, Tah. - Khalapur, Dist- Raigad, Maharashtra.
Cat B - 05.01.2024
24M/s. Tata Steel Limited Tarapur, Plot A6Regularization Of Existing Production Facilities For Steel Wires Of Capacity 175000 TPA Located At Plot - A6, Tarapur Industrial Area, PO. Boisar, Tehsil & District - Palghar, Maharashtra – 401506Cat B - 05.01.2024
25M/s. Tata Steel Limited Tarapur Plot F8Regularization Of Existing Production Facilities For Steel Wires Rods Of Capacity 336000 TPA, Steel Wire & Wire Products – 66,000 TPA (Total Production Capacity - 402000 TPA)” Located At Plot- F8 MIDC, Village - Kolawade, Tarapur Industrial Area, Po-Boisar, Tehsil & District - Palghar, Maharashtra – 401506Cat B - 05.01.2024
26M/s. Tata Steel Limited PithampurRegularization of Existing Production Facilities for Steel Wires of Capacity 180000 TPA [Seeking EC for regularization of existing CTE Capacity as per NGT Order dtd. 12.02.2020 and MoEFCC, Notification S.O. 3250(E) dtd. 20.07.2022] At Plot No. 158 & 158A, Sector-III, Industrial Area Pithampur, Tehsil & District : Dhar, Madhya Pradesh – 454775 by M/s. Tata Steel LimitedCat B – 19.02.2024
27M/s. Kalyani Ispat LimitedGreenfield project of Sponge Iron 660000 TPA; MS Billets 465696 TPA; Rerolled Steel Products through Hot Charging & Reheating Furnace 478500 TPA; Iron Ore Pellets 1.2 MTPA; SAF to produce SiMn 36000 TPA and/or FeMn 46000 TPA and/or FeSi 22,500 TPA and/or Pig iron 63000 TPA; Captive Power of 75MW (50MW thru WHRB & 25MW thru CFBC); Pipe Mill 155100 TPA; Galvanized Mill 155100 TPA and Fly Ash Bricks 41500 TPA located at Village-Kopideh, Tehsil & Dist.- Rajnandgaon (CG)Cat A – EC
recommended by EAC (Industry-I) New Delhi

Synthetic Organic Chemicals Industry

Sr.
No.
Project ProponentProject Details & Plant Cap.Date of EC Granted
1M/s. Jeevika Spachem Pvt. Ltd.EIA for Proposed Expansion of Organic Chemicals Unit for Manufacturing Esters, Surfactants/ Sulphosuccinates, Defoamers / Antifoamers & amp; Emulsifying agents at Plot No. K-53 and K-53 (part), MIDC Industrial Area, Butibori, Dist. – Nagpur, MH.Cat B – 25.01.2016
2M/s. Balaji
Steroids And Hormones
EIA for Proposed Manufacturing of Steroids with a production capacity 18 TPA Plot No.: F-24, Sector 1, Special Economic Zone Phase I, (Processing Unit), Pithampur, Dist. Dhar, M.P.Cat B - 26.07.2017
3M/s. Vacmet India LimitedProposed Manufacturing of Polyester Resin- Polyethylene Terephthalate (PET) Resin -99000 METRIC TON /ANNUM and installation of HTM heater (Pet coke as fuel) 13.5 Million KCAL Plot No. 1, New Industrial Area Ujjaini (MPAKVN), Lebad - Manpur Road, Village Ujjaini, P.O. Digthan, Tehsil, Dhar, District Dhar (MP) Pin Code – 454773.Cat B - 01.03.2018
4M/s. Paramount ChemproProposed Formaldehyde Production Unit at Plot No. C- 6, MIDC Industrial Area, Butibori, Nagpur.Cat B - 12.03.2018
5M/s. Solar Industries
India Ltd. (SIIL)
Expansion & Modernization of Existing Project For Manufacturing of Explosives & Defence Products Village-Chakdoh, Tahsil- Katol, Dist. Nagpur, Maharashtra.Cat A - 07.06.2019
6M/s. SRF IndoreProposed enhancement in capacity (expansion project) Special Economic Zone, Phase-I, Sec-III, Plot No. C-1 to 8, C-21 to 30, D-13 to 18, D-25 to 32 and 41, 41A,
42, 43 & 54, 55, 56 & 56A, Village & Tehsil-Pithampur, District-Dhar (M.P.) – 454775.
Cat B - 08.02.2018
7M/s Symbiotec PharmaEIA for Proposed Expansion for Manufacturing of Steroids and Hormones with a production capacity from 48 MTPA to 1000 MTPA, Plot No. 3,5,6,7 & 8 Pharma Zone Phase II, Indore Special Economic Zone, Tehsil: Pithampur, Pin Code : 454 774, District: Dhar, State: Madhya Pradesh.Cat B - 28.11.2019
8M/s. CDET
Explosive Industries Pvt. Ltd.
Expansion of existing project for manufacture of mining explosives and proposed high energy defense products (PETN- 1500 MTPA, RDX -500MTPA and DNT/TNT-
1500 MTPA) Village Mouza - Talegaon (S.P), Taluka - Ashti, Dist-Wardha, Maharashtra.
Cat A- 19.08.2020
and EC Amend on 27.01.2021
9M/s. Keltech Energies Ltd.Expansion of existing & addition of new explosive products (PETN- 350 MTPA to 1600 MTPA new addition of Mono Methyl amine nitrate (MMAN) 5000MTPA).at Village Garamsur, Post Dudhala, Tehsil Katol, District Nagpur-441103, Maharashtra.Cat A - 14.07.2020
10M/s. Chemiker Pharmaceuticals“Proposed API Intermediate Manufacturing Unit (456 TPA)” located at Notified Industrial Area, MIDC Butibori, Plot no. G-95/1, Village: Kirmiti, Tehsil Hingna, District Nagpur-441 122, Maharashtra.Cat B - 24.06.2020
11M/s Canpex Life Science LLPProposed new Project for Manufacturing of API & API intermediates at Survey No.165-A-1, Ambhora Village, Tal. - Ashti, Dist. Beed Maharashtra.Cat A - 05.01.2021
12M/s. Bhansali Engineering Polymers LimitedEXPANSION OF HIGH RUBBER GRAFT-HRG (RUBBER RICH ABS) UNIT FROM 15000 TPA TO
50000 TPA Satnoor Plant, Bhansali Nagar, Taluka Sausar, Dist. Chhindwara 480108 (MP)
Cat A - 16.09.2021
13M/s. Vistaar Agri Foods Pvt. Ltd.Proposed to setup a 70000 TPA (200 TPD) maize processing plant (manufacturing of Sorbitol 35000 TPA (100 TPD) and Starch 18550TPA (53 TPD)) at Village – Saguni and Bherwa, Circle – Dharsiwa-I, Tahsil-Tilda, District – Raipur (C.G.). For manufacture of Maize Starch 18550 TPA (53 TPD) and 35000 TPA (100 TPD)
Sorbitol manufacturing plant to cater for the ever increasing demand of Starch/Sorbitol in the exceedingly fast developing state i.e. Chhattisgarh.
Cat A - 22.04.2022
14M/s. Cosmo Speciality Chemicals Pvt. Ltd.Proposed manufacturing, synthesis and formulation of packaging adhesive, wood adhesive with capacity of 4000 MTPA at Plot No. B-14/10, Notified Industrial Area, MIDC Waluj, Tehsil - Gangapur, District - Aurangabad, Maharashtra-431136Cat B - 09.06.2022
15M/s. Asha Resins Private LimitedEnvironmental Impact Assessment for Proposed expansion of Liquid formulations from 600 TPA to 1080 TPA, Powder formulations from 600 TPA to 700 TPA, Cation Exchange Resins from 300 TPA to 3000 TPA, Biocide from 24 TPA to 360 TPA, Dispersants from 24 TPA to 360 TPA, Flocculating Agents from 12 TPA to 240TPA and newly added Oil field chemicals 1200 TPA (Manufacturing of Water & Waste Water treatment – Resins & Chemicals) At Gat No. 227/2, Alandi Markal Road, Village Dhanore, Taluka Khed, District Pune, Maharashtra – 412105.Cat A - 12.05.2023

Isolated storage & handling of hazardous chemicals

Sr. No.Project ProponentProject Details & Plant Cap.Date of EC Granted
1IOCL JalandharStorage Capacity Expansion At Jalandhar, Indian Oil Corporation Ltd.(MD) , Pipeline Terminal, Suchipind, Jalandhar -144009, Punjab.Cat B - 01.07.2019
2IOCL BhatindaStorage Capacity Expansion At Bathinda TOP, Indian Oil Corporation Ltd.(MD) , Phoos Mandi, Mansa Road, Bathinda-51001(Punjab).Cat B - 01.07.2019
3IOCL JaipurStorage Capacity Augmentation At IOCL Petroleum Terminal, Mohanpura, Jaipur, RajasthanCat B - 29.10.2018
4IOCL ChittorgarhProposed Storage Capacity Augmentation At Indian Oil Corporation Limited LPG Bottling Plant at N.H.79 Jalampur Nimbahera Road, Chittorgarh (Rajasthan).Cat B - 22.12.2017
5IOCL JodhpurFor Proposed Expansion Project At IOCL Jodhpur POL village - Salawas, Tehsil-Loni, District- Jodhpur - 322804.Cat B - 22.12.2017
6BPCL BarellieyStudy For Installation Of Mounded Storage Vessels For Storage Capacity Augmentation At LPG Bottling Plant, Plot No B-60,61,Road No-4 , Parsa Khera, Industrial Area Rampur Road Bareilly .Cat B - 01.04.2017
7HPCL KotaFor Installation Of Mounded Storage Vessels For Storage Capacity Augmentation At LPG Bottling Plant Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil- Ladpura, Cable Nagar, Kota (Rajasthan) – 325003Cat B - 22.12.2017
8IOCL, RatlamEIA / RA Study For Installation Of Petroleum Storage Tanks For Storage Capacity Enhancement at IOCL Ratlam Terminal Indian Oil Corporation Ltd. (MP), Ratlam Pol Terminal, Bangrod, Ratlam- 457111Cat B -17.10.2018

Building and Construction projects

S.NoProject ProponentProject Details & Plant Cap.Date of EC Granted
1M/s. Emaar Developers & Builders Pvt. LtdEnvironment Clearance for M/s. Emaar Developers & Builders Pvt. Ltd at Kh. No. 21/1,
C.S. No. -39, Village Chikhali (Khurd), Tal and Dist. Nagpur.
Cat B - 22.03.2018
2M/s. CtrlS
Datacenters Ltd.
Addition to Existing Datacenters Plot no. GEN 72/ 1 / A, TTC, Industrial Area, MIDC, Mahape, MHCat B - 01.02.2019
3“Fortune Mall & Pulse Care Hospital”“Fortune Mall & Pulse Care Hospital” at Sitabuldi Nagpur Land Area -8931.562 Sq,M Constructed covered area - 28228 Sq.M.Cat B - 22.03.2020
4M/s. SSH HospitalSuper specialty Hospital Total BUA 27085.81 Sq. M. at village koni city bus Depot District Bilaspur Chhattisgarh.Cat B - 23. 03.2020
5M/s. CtrlS (India) Pvt. LtdProposed Construction of Datacenter of M/s. CtrlS (India) Pvt. Ltd. at Plot no. EL-202, 201/part and 201/part/1, TTC Industrial area, Mahape, Taluka - Navi Mumbai, Dist. Thane - 400701.Cat B - 05.08.2021
6M/s. Akshay EnterprisesViolation regularization as per SEIAA Mah Notice No. SIA/MH/MIS/251922/ 2022 dated 14.09.2022 with reference to MoEF&CC O.M. Vide F. No. 22-21/2020-IA.III dated 07.07.2021
for Proposed Residential & Commercial project "Yash Florencia" with expansion from BUA – 27,873.38 Sq.Mt. to 43,000 Sq.Mt. at
SS. No. 28/2, Kondhwa Budruk, Teh: Haveli, Dist.: Pune. Violation Case
Cat B - EC 09.02.2024

Township and Area development projects

Sr. No.Name of ClientAddressDate of EC Granted
1MIDC (Additional) Phase - IAdditional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra. (1450 Ha.)Cat A - 25.10.2016
2MIDC (Expansion) Phase - IIAdditional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra. (270 Ha.).Cat A - 09.11.2016
3Infosys Ltd.,Proposed Expansion of IT Park, Infosys Limited Plot No 24, MIDC, Rajiv Gandhi InfoTech Park Phase II, Village- Mann, Tal-Mulshi, Hinjawadi, Pune (MH)-411057 (Total Built up Area 9,60,774 m2)Cat A - 27.08.2018
4M/s. Modern
Coach Factory (MCF)
Capacity augmentation from 1000 to 5000 coaches/annum at Village – Lalganj, District – Rae Bareli, Uttar Pradesh – 229120 Existing Sanctioned Area: 8,29,040 Sq. m Existing Built-Up Area: 4,59,875 Sq. m Additional Proposed Area: 4,08, 420 Sq. m Total Built-up Area: 8, 68, 295 Sq.
M. SEIAA Uttar Pradesh
Cat B - 23.05.2022

Distilleries

Sr. No.Project ProponentProject Details & Plant Cap.Date of EC Granted
1M/s. Khemani Distilleries Pvt. Ltd.Proposed Expansion Of Grain Based Distillery (33 KLPD TO 59 KLPD) And Installation Of 3.75 MW Cogeneration Power Plant Ringanwada, Kachigam Road, Daman - 396210Cat B1- 27.08.2018
2M/S Khemani Distilleries Pvt. Ltd.Expansion Of Existing Grain Based Distillery From 59 KLPD To 71 KLPD Along With 3.75 MW Co- Generation Power Plant Based On Agro Fuel By M/S. Khemani Distilleries Private Limited At Village- Ringanwada, Kachigam Road & Nani Daman, Daman
& Diu – 396210 [Application Under 7 (Ii) EIA Notification S.O.236 (E) Dt.16 Jan’2020 For Proposed 20 % Capacity Addition Of Ethanol With “No Increase In Pollution Load”].
Cat B - 28.12.2020
3M/s. Kusum Smelters Pvt. Ltd.Grain Based Bio Ethanol 35000 KLA (100KLD); Animal Feed Grade Protein 28000 TPA DDG, Bio CNG 3000TPA And CO2-17500 TPA, Power (Coal
Based Co- Generation) 3 MW Co-Generation As A Greenfield Project, At Village - Dhamni, Tahsil - Patharia, District - Mungeli, Pincode- 495224 (CG).
Cat A - 02.09.2022
4M/s. Allied Blenders And Distillers Private Limited (ABDPL)Proposed Expansion Of Existing Grain Based Distillery From 150 KLPD (150 KL X 365 Days = 54,750 KLPA)
To 180 KLPD (180 KL X 365 Days = 65,700 KLPA)
Along With Existing 6.5 MW Power Plant At Survey No. 690/AA, 691/AA2 & 692, Village - Rangapur, Mandal - Pebbair, District - Wanaparthy, State – Telangana - 509104
Cat B1 - 09.03.2023

Fuel grade Ethanol under distillery

Sr.
No.
Project ProponentProject Details & Plant Cap.Date of EC Granted
1M/s. Hayati Beverages Private LimitedGreenfield Project For Manufacturing Of Grain Based Bio Ethanol (fuel grade) Along With Cogeneration Power Plant By Hayati Beverages Private Limited. At Village Bhainsa, Tehsil And District Bemetara Of CG.Cat B2 - 02.03.2022
2M/s. Kalindi Ispat Private Limited (Bioenergy Division)“Greenfield Project For Manufacturing Of 180 Kld Grain (Rice And Maize) Based Bio Ethanol Along With
5.0 Mw Bio Mass Based Co-Generation Power Plant” At Village-Belpan, Tahsil - Masturi & District - Bilaspur (C.G.)
Cat B2 - 14.03.2022
3Indramani Industries Private LimitedGreenfield project for installation of production facilities for 60 KLD Bio-Ethanol plant along with 2 MW Co-gen plant under Ethanol blended petrol program launched by GOI at Village-Paraswar Khurd, Tahsil Rajpur, District – Balrampur- Ramanujganj of Chhattisgarh StateCat B2 - 10.10.2022
4M/s. Vivek Bio Products Private Limited.Proposed 199 KLPD Ethanol (Grain Based Distillery), Along With 5 MW Co-Generation Captive Power Plant At Village Lingampally, Kamareddy District, Telangana State 503145Cat B2 - 01.02.2023

Manmade Fibers

Sr. No.Project ProponentProject Details & Plant CapacityDate of EC Granted
1M/s. SRF Limited, MalanpurIncreasing Production Volume through addition of Twisting and Weaving Machineries, addition of Dipping Unit and addition of Pet Coke boiler & TFH Plot nos. - D-1 to 4 and E-1 to 24, at AKVN notified Industrial area, Malanpur, District Bhind, Pin code - 477116 (M.P).Cat B - 29.06.2017

Oil & gas transportation pipelines, passing through national parks/ sanctuaries/coral reefs/ ecologically sensitive Areas including LNG terminal

Sr. No.Project ProponentProject Details & Plant Cap.Date of EC Granted
1M/s Gujarat State Petronet LimitedLaying 36/30” Natural Gas transportation pipeline from Anjar (Kutch) to Chotila (Surendranagar) covering approximate length of 196.14 Km with associated facilities in state of Gujarat.Cat A -13.10.2020
2M/s Indian Oil Corporation Ltd.Kandla-Viramgam Gandhinagar Sanand Section of Kandla - Gorakhpur Pipeline (298 KM). Total pipeline section - Kandla Gorakhpur Pipeline (2757 km) from Kandla (Gujarat) to Gorakhpur (Uttar Pradesh)Cat A 19.08.2021
3M/s Indian Oil Corporation Ltd.Dumad (IPS-1)-Indore-Ujjain section of Kandla Gorakhpur Pipeline (243 Km) with associated facilities in the state of Gujarat and Madhya Pradesh.Environmental Assignment Report Submitted to Client
4M/s Gujarat State Petronet LimitedNatural Gas Pipeline (30.623 KM) in Ahmedabad of Gujarat StateEnvironmental Assignment Report Submitted to Client
5M/s Gujarat State Petronet LimitedNatural Gas Pipeline (47.250 Km) in Botad and Rajkot District of Gujarat StateEnvironmental Assignment Report Submitted to Client
6M/s Gujarat State Petronet LimitedNatural Gas Pipeline (44.072 KM) in Kutch District of Gujarat StateEnvironmental Assignment Report Submitted to Client
7M/s GSPL India Gasnet Ltd.HRRL Connectivity Natural Gas Pipeline Project – (Starting from SV-1 of Barmer Pali Pipeline till HRRL Pachpadra Refinery)Environmental Assignment Report Submitted to Client

RA/HAZOP/ERDMP Studies Completed

Sr. No.Project ProponentProject Details & Plant Cap.Date of EC Granted
1M/s Hindustan Petroleum Corporation Ltd.Carrying Environmental Impact Assessment, Risk Analysis, Disaster Management Plan and HAZOP Study at 7 Bottling Plants (Chandrapur, Jabalpur, Khapri, Nashik, Kota, Rajahmundry, Manglia & Chakan)Environmental Assignment Report Submitted to Client
2M/s Indian Oil Corporation Ltd.Carrying out Quantitative Risk Assessment, HAZOP Study and preparation of ERDMP for IOCL, Mathura Marketing Terminal, Near Baad Railway Station, Behind Mathura Refiinery, Mathura (U.P.)Environmental Assignment Report Submitted to Client
3M/s Indian Oil Corporation Ltd.Conducting Risk Analysis, HAZOP, EIA Study For Installation Of Petroleum Storage Tanks For Storage Capacity Enhancement at IOCL Ratlam Terminal Indian Oil Corporation Ltd. (MP), Ratlam Pol Terminal, Bangrod, Ratlam - 457111Environmental Assignment Report Submitted to Client
4M/s Hindustan Petroleum Corporation Ltd.Conducting Quantitative Risk Analysis and HAZOP study installation of augmentation of new facility at LPG Bottling Plant at Plot no. 1 & 2 Phase II, Maneri Industrial Area, Tehsil-Niwas, Distt.- Mandla, Madhya pradesh- 481886Environmental Assignment Report Submitted to Client
5M/s Indian Oil Corporation Ltd.QRA study for installation of Petroleum Storage Tanks for Storage capacity augmentation at IOCL fore shore Terminal, Kandla (Gujarat)Environmental Assignment Report Submitted to Client
6M/s Indian Oil Corporation Ltd.Preparation of Quantitative risk analysis, HAZOP study and preparation of Emergency Response Disaster Management plan (ERDMP) as per latest PNGRB Guidelines at Mannargudi Bottling Plant at Mannargudi, TamilnaduEnvironmental Assignment Report Submitted to Client

No Increase in Pollution Load (NIPL) Studies

Sr. No.Project ProponentProject Details & Plant Cap.Status
1M/s. Ambuja Cements Ltd.EMS Adequacy and Assessment “No increase in Pollution Load” of M/s. Ambuja Cements Ltd. (Unit : Maratha) At Upparwahi, Chandrapur, MaharashtraEnvironmental Assignment Report approved by MPCB
2M/s. Shree Rupanadham Steel (P) Ltd.“Change in Product mix” (by reconfiguring the production capacities of different process with no increase in pollution Load) under para 7(ii) of EIA Notification” at Saraipalli Village, Tamnar Tehsil, Raigarh District, ChhattisgarhEnvironmental Assignment Report approved by CECB
3M/s. RS Ispat (P) Ltd.Study on assessment of No Increase in Pollution Load for Change in product mix due to reconfiguration of plant located at OP Jindal Park Village: Tumidih/Punjipathra, Tamnar Tehsil, Raigarh District, ChhattisgarhEnvironmental Assignment Report approved by CECB
4M/s. Oil and Natural Gas Corporation Limited (ONGC)Augmentation of slug catcher phase-III with phase-IIA and replacement of slug catcher phase-II at Uran plant, Nagaon Village, Tehsil Uran, Dist. Raigad 400 702, MaharashtraEnvironmental Assignment Report approved by MPCB
5M/s. Crystal Crop Protection LimitedModification in Existing Agrochemical Product mix without increase in Production Capacity (6480 TPA) located at Plot No. G 54, MIDC Industrial Area, Butibori, Tehsil : Hingna, District: Nagpur, Maharashtra – 441122.Environmental Assignment Report approved by MPCB
6M/s. Iskcon Strips Pvt. Ltd.“Expansion in production capacity along with change in configuration/raw mix through backward integration by implementation of induction furnaces and hot charging process based steel rolling in place of existing reheating furnace based existing steel rolling mill and addition of contiguous land” located at Village - Guma, Tahsil and District- Raipur (CG)Environmental Assignment Report approved by CECB
7M/s. Brahmaputra Biochem Private LimitedProposed Expansion of Existing Grain Based Distillery from 60 KLPD to 90 KLPD along with Existing 2.0 MW Power Plant at Village – 2 No. Jambari, Tehsil - Chaygaon, District - Kamrup, State - Assam, Pin Code – 781141Environmental Assignment Report approved by PCB, Assam

Hazardous Waste Management Studies

Sr. No.Project ProponentProject Details & Plant Cap.Status
1M/s. Travancore Titanium Products Ltd.Detailed ETP By-products - Red Gypsum and White Gypsum w.r.to Hazardous Waste Management Rules, 2016 and define it as co - product and its permission to sale to Cement and Pottery Industries at Kochuveli, Thiruvananthapuram, Kerala - 695021Environmental Assignment Report approved by PCB, Kerala, finally approved by MoEFCC, Delhi.
Haz Waste Committee

Additional special assignments handled

  • Anacon Labs have successfully completed work for National Productivity Council, GOI the scope includes environment data generation work for their municipal solid waste site and analysis municipal solid waste samples in 9 districts in Chhattisgarh State.
  • MECON have assigned a job of carrying out socio-economic studies, terrestrial ecological studies and land-use pattern for Bhilai Steel Plant. The work is successfully completed which includes Geocoded satellite imagery and interpretation. The Lab is having fully installed software support for the interpretation of GIS.

The ANACON team is here to help with all your questions – get in touch!